Setting a new benchmark for sustainable urban development and dynamic placemaking in Austin
{"autoplay":"true","autoplay_speed":"3000","speed":"300","arrows":"true","dots":"false","loop":"true","nav_slide_column":5,"rtl":"false"}

DETAILS

LocationAustin, Texas, United States
ClientBrandywine Realty Trust
Size66 acres

Previously a single-use, auto-centric office complex, Uptown ATX is a 66-acre transformation resulting in a transit-oriented, mixed-use neighborhood that further bolsters the burgeoning technology hub of Northwest Austin. Situated between the Charles Schwab campus and The Domain, the Uptown ATX master plan features 3.2 million square feet of workspace, 2.9 million square feet of multi-family units, 600,000 square feet of retail and hospitality, and 11 acres of public open space. The development includes a new CapMetro Rail station, providing a critical mass transit connection to downtown Austin and the larger region. SWA/Balsley, supported by Austin-based Coleman & Associates, collaborated with Brandywine Realty Trust and a multidisciplinary team of designers, planners, and engineers on the public realm of Uptown ATX.

SWA/Balsley’s work at Uptown ATX includes the public realm and amenity terraces at One Uptown, The Chase at Uptown, Uptown Boulevard, Uptown Commons, One and Two Skyrise, and Walnut Springs Lake Park. The densest site in the neighborhood, the Skyrise block includes a collection of exceptional social spaces and recreational amenities, notably a 1.4-acre sports park and a multipurpose lawn. A transit plaza facilitates the diagonal movement of commuters and shoppers between the new train station and the neighborhood’s primary retail corridor and will host public events such as markets, festivals, and performances.

Walnut Springs Lake Park spans nearly seven acres and is a signature open space of the neighborhood. Its central body of water functions as a combination detention/retention pond. Shaped by a complex set of regulatory constraints, the pond incorporates resilient features that can withstand periodic flooding during storm events. While most of the primary program spaces are situated above the flood plain, park users are invited to a lower path in times without flooding. The significant grade change is negotiated by a combination of steps, amphitheater seating, informal “scrambles” of monolithic limestone blocks, and universally accessible pathways. The pathways circumnavigating the pond link with a regional trail system at the site’s north end, providing Uptown ATX residents and workers access to nearly 23 miles of uninterrupted recreational trails.

Collaborators:
Coleman & Associates – Local Landscape Architect
Page Southerland Page  – Architect
GFF – Architect
Kimley Horn – Civil Engineering
Walter P. Moore – Structural Engineering

Balsley Park

Located on Manhattan’s West Side, Balsley Park, formerly known as Sheffield Plaza, has been transformed from a barren, lifeless plaza into the community’s most cherished common ground.

Following public outcry and many failed attempts to redesign the plaza, Thomas Balsley Associates was hired to build community consensus around a new park-like image and ...

Residences at W New York Downtown

The Residences at W New York Downtown is located in lower Manhattan. The at-grade public plaza creates an urban space with a food kiosk surrounded by a large raised wood deck with table, chairs, and built-in custom stainless steel benches and bar seating along the perimeter. A series of interplaying IPE wood and pre-cast concrete benches creates seating and co...

Innovation QNS

In the heart of Astoria, Queens, Innovation QNS transforms an underperforming light industrial district into a mixed-use neighborhood. Envisioned as a “15-Minute City,” the development blends affordable and market-rate housing, office space, hotels, retail, entertainment, and community facilities, served by multiple subway and bus lines providing access to Mid...

Chelsea Waterside Park

In 1986, Thomas Balsley Associates was asked by the Chelsea Waterside Park Association to translate this community’s vision for a waterfront park into a design document that would be used to plan the new Route 9-A and the proposed Hudson River Park. Ten years later, when funding for the Chelsea Waterside Park was identified, Thomas Balsley Associates won an in...